Renewables & Environment
RENOVA partners with Shoreline to overcome complex onshore wind challenges in Japan and the Philippines
≈50 MW
Philippines project in pre-development
13 turbines
Japan onshore wind project under construction
About
RENOVA is a diversified renewable energy developer and independent power producer headquartered in Japan, deploying wind, solar, biomass and other technologies to advance the energy transition.
Industry
Renewables & Environment
Company size
200 – 500 employees
Founded
2000
“Shoreline Wind’s technology allows us to plan our projects more effectively by reducing operational costs and improving overall performance during the planning and construction phases. Integrating Shoreline’s advanced simulation software is a crucial step in scaling our operations internationally while maintaining the highest standards of efficiency and sustainability.”
Takaaki Kurihara
Lead Civil Engineer
The Company
Delivering on-shore wind solutions in complex environments
With on-shore wind projects in Japan’s mountainous terrain and the Philippines’ emerging infrastructure markets, RENOVA takes on some of the most challenging logistics and development environments. To scale effectively, the company recognised the need for advanced planning tools that can simulate end‐to‐end construction and operational scenarios.
The motivation
Reducing risk and cost in logistics‐heavy wind projects
On-shore wind developments often involve complex equipment transport, limited staging space, multimodal logistics and weather/tide constraints — especially in Japan and the Philippines. RENOVA sought a digital simulation solution to optimise delivery, resource allocation and schedule reliability during the development and pre-development phases.
“Additionally, the platform uses ERA5 data including atmospheric, land, and oceanic climate variables to improve onshore wind farm construction planning by analysing downtime and identifying areas for improvement. It accounts for seasonal variations and waiting times, providing a more realistic and feasible construction plan. By addressing key sources of downtime, RENOVA can create a more efficient schedule. “
Hidemi Yanagi
Principal Engineer
The Solution
Partnering with Shoreline for scenario-based construction planning
Through Shoreline’s simulation platform, RENOVA modelled transportation logistics, component delivery, weather-impacted scheduling and staging constraints for both its Japanese and Philippine on-shore wind projects. The platform enabled data-driven insight from early design through execution, reducing uncertainty and enabling more accurate planning.
The Results
Improved planning accuracy, fewer bottlenecks and cost control
By integrating simulation into its project planning, RENOVA gained clarity on logistics constraints, improved resource utilisation, reduced potential downtime and accelerated development timelines. The partnership strengthens RENOVA’s ability to deploy on-shore wind in challenging markets with greater confidence and efficiency.