Inventory Management

Inventory Management

Track materials, tools, and equipment, ensuring that inventory is available when needed, avoiding overstocking or stockouts.​

Solving Industry Challenges

Wind farm operations involve managing a large inventory of parts and materials, often across multiple locations. Inefficient inventory tracking can result in delays, overstocking, or stockouts, all of which negatively impact operations and maintenance.

Shoreline’s Inventory Management product offers real-time tracking of all materials and parts. It optimizes stock levels, reduces waste, and ensures that necessary items are available when needed, reducing operational disruptions and improving efficiency.

Maintain optimal stock levels of spare parts and consumables across sites

Enable rapid part availability to reduce delays and downtime

Improve material visibility and tracking for better logistical control

Bill of Materials & Reservation Workflow

Bill of Materials & Reservation Workflow

Bill of Materials & Reservation Workflow

Manage inventory names, groups and units for accurate tracking

Manage inventory names, groups and units for accurate tracking

Manage inventory names, groups and units for accurate tracking

Build Bills of Materials based on generic inventory names, then reserve the specific items for tasks; track reservations, pickups, consumption and restocks through work orders.

Build Bills of Materials based on generic inventory names, then reserve the specific items for tasks; track reservations, pickups, consumption and restocks through work orders.

Build Bills of Materials based on generic inventory names, then reserve the specific items for tasks; track reservations, pickups, consumption and restocks through work orders.

Stock Levels & Restock Modelling

Stock Levels & Restock Modelling

Stock Levels & Restock Modelling

Define BOMs and reserve required parts for work orders

Build Bills of Materials based on generic inventory names, then reserve the specific items for tasks; track reservations, pickups, consumption and restocks through work orders.

Stock Levels & Restock Modelling

Stock Levels & Restock Modelling

Stock Levels & Restock Modelling

Configure stock levels and restocking to optimise project flow

For each component define maximum and initial stock levels, set fixed restock rates or transport-tasks, and simulate stock behaviour under capacity constraints to avoid assembly delays.

Inventory Integration with Tasks

Inventory Integration with Tasks

Inventory Integration with Tasks

Integrate inventory actions directly into assembly and transport tasks

Input components and output products are linked to base and asset tasks; tasks such as transport, assembly and installation automatically reflect inventory movements and stock changes.

60+ global companies use the Shoreline platform

60+ global companies use the Shoreline platform

60+ global companies use the Shoreline platform

Check out our latest success stories

Ready to Build Smarter? 

Request a custom quote and explore the Shoreline platform in action.