Wind farm construction involves intricate coordination of resources, specialized vessels, and strict timelines. With fluctuating costs, unpredictable weather, and complex logistics, delays can easily escalate, impacting both the budget and project timeline. The need for accurate forecasting and risk management is critical, as is the ability to manage and adapt to evolving operational challenges like equipment failure, weather disruptions, and shifting regulations. Without the right tools, these challenges can lead to inefficiencies and unnecessary costs. Shoreline’s platform provides a comprehensive, data-driven solution designed to address the unique challenges faced by EPCIs in wind farm construction. With Shoreline, EPCI contractors can reduce delays, optimize costs, and ensure timely project completion, driving efficiency and profitability throughout the design and construction phases.
Save 3 hours per day, per planner
Execute projects better to save time and cost
Save $300k per day on transport costs
Eliminate sub-optimal changes with AI plans and forecasts
Save 10% OPEX reduction
Execute the right tasks, with the right resources, at the right time
Substantially reduce construction risk and cost
Leverage simulations and real-time data to proactively identify and mitigate risks
Streamline supply chain management and reporting
Simplify logistics, enhance communication, and reduce delays and errors
Eliminate resource redundancy
Optimize resource allocation and automate scheduling
Achieve safer, more cost-efficient workflows – from monitoring and operations to compliance and reporting – and increase production with one unified cloud-based asset lifecycle profiling and management solution.
All SolutionsOptimize construction processes, by identifying potential issues, and improving project timelines with predictive insights.
Construction SimulationsOptimize maintenance strategies by reducing downtime, lowering operational costs, and extending asset life.
Operations and Maintenance (O&M) SimulationsManage work orders efficiently, improving operational efficiency, reducing delays, and ensuring better accountability.
Work Order ManagementTrack permits and ensure compliance for faster approval cycles, and less risks and costly delays.
Permit ManagementIdentify, report, and resolve defects, ensuring high-quality project outcomes with proactive quality control.
Defect ManagementTrack materials, tools, and equipment, ensuring that inventory is available when needed, avoiding overstocking or stockouts.
Inventory ManagementOptimize workforce and logistic allocation to maximize efficiency, reduce downtime, and meet more project deadlines.
Resource ManagementStreamline task allocation and scheduling, for effective prioritization, reducing bottlenecks, and improving productivity.
Work PlanningProvide real-time tracking of logistics, equipment, and personnel to ensure smooth transfers, improved safety, and operational efficiency in challenging environments.
Marine CoordinationManage the assembly process and coordinate the logistics of shipping equipment, ensuring that all components are delivered on time and in the correct order.
Assembly and ShippingAccurately log work hours and activities to improve payroll accuracy and track project progress.
Time Tracking and ReportingAutomate reporting, improving transparency and decision-making, ensuring smooth project execution and management.
ReportingReal-time tracking and deep insights into the operational progress to drive continuous improvement across projects.
Monitoring and AnalysisCopyright © 2016-2025 Shoreline AS. All rights reserved